Home The Details

The Details

Finishes
and
specifications

Finishes and
specifications

Foundation Substructure

RCC Foundation & RCC Framed Structure

Superstructure

Tower -A , Clubhouse – 1 & 2: Conventional RCC Frame Structure with Block Masonry
Other Tower’s: Aluminium Form Work – Shear Wall Technology

Main Door

Main Door Frame: Best Quality Teak Wood Frame with Polish.
Main Door Shutter: 38 mm to 40 mm both side Teak Veneer Shutter with Polish Finish.

Internal / Bedroom / TOILET Utility DOORS

Engineered hard wood frames with flush shutters of 32mm thickness with enamel paint finished on both sides.

Toilet Doors

Engineered hardwood frame with laminated flush shutters of 38 mm thickness.

Sliding Doors (For Balconies)

UPVC door frames with clear glass shutters, provision for mosquito mesh track.

windows

UPVC window systems with safety grill (MS) and provision for mosquito mesh. Track & Aluminum for toilet ventilators and staircase windows.

external

One coat primer and two coats of external emulsion paint.

internal

Two coats of putty, one coat primer and two coats of emulsion paints of best brands.

Rooms

Living, dining, all bedrooms, kitchen 600×600 mm size nano vitrified tiles.

Corridor

GVT ( Vitrified Tiles).

Common Lobbies

Granite / Vitrified tiles combination flooring as per design

Toilets

Anti-skid ceramic tiles for flooring

All Balconies / Utilities

Mat/ Anti skid ceramic tiles.

Staircase

Up to 3 floors granite and balance anti skid tiles.

Lift Lobby

Granite / Vitrified tiles combination flooring as per design

Kitchen

Dadoing in kitchen: glazed ceramic tiles dado up to 2′ height above kitchen platform

Toilets

Glazed ceramic tile dado up to door/lintel height.

Utility

Tile dado up to 3′ height

balcony

Ms railing as per the elevation

Water Connections

Separate municipal tap (manjeera or any other water provided by hmwssb along with bore well water).

Exhausts

Provision for Chimney.

Utility/Wash

Washing machine provision in utility area
Provision for fixing of water RO system

sanitary

Aquar or Cera or Equivalent

CP fittings

Jaquar or Hindware or Equivalent
Wash basin in all bed room toilets
Wall mounted EWC, with extended tank
Wall mixer with shower.
Provision for geyser and exhaust fans in all bathrooms.

Cables

Concealed copper wiring of Polycab or Anchor or Equivalent.

modular switches

Schneider or Anchor or Equivalent.

power Outlets

For air conditioner’s in all bedrooms, for geysers in all bathrooms, for kitchen hob, chimney, refrigerator, microwave oven, mixer, RO in kitchen & for washing machine in utility area.
Provision For Exhaust Fan in all Toilets

Drainage/ Sewage

PVC pipes & PVC fittings

Water Supply Lines

Internal and external CPVC or UPVC pipes & fittings.

Cable / Internet

Provision for Internet/ DTH

common amenities
and facilities

common
amenities and facilities

Sophisticated Round-the-clock security system.
Surveillance cameras at the main security, entrance of each block and club house. 
Panic button inside the lifts.
Solar power fencing around the compound.
 

Passenger lifts & one service lift for each tower with auto rescue device with V3F for energy efficiency.(Schindler/Johnson or Equivalent make)

Softened water

Softened water made available through an exclusive water treatment plant (in case of bore water).

Sewage Treatment

Sewage treatment plant of adequate capacity as per norms will be provided inside the project, treated sewage water will be used for the landscaping /flushing purpose.

RAIN WATER

Rain Water from the terrace will be collected in storage tanks and used for domestic purposes. Excess rain water & Open areas water will be collected through Rain water pipes, which will be discharged in the rain water harvesting pits to recharge the groundwater.

Clubhouse – 1

Reception, lobby, multi-purpose hall, two badminton courts , table tennis, squash court.

Clubhouse – 2

Lobby, yoga / aerobics, kids play area, billiards room, mini theater, gym with equipment, library & guest rooms.

Space for Facilities like

Restaurant/ Multi-Purpose Hall, Creche, Space for Spa & Saloon, Space for Clinic, Pharmacy, Space for Departmental store, Conference Room & Co-Working office Space.
Swimming Pool, half basketball court, tennis court, cricket practice net, kids play areas, senior citizen court, party lawn, central party lawn, open lawn, lawn with seating, amphitheater and promenade, jogging track, outdoor gym and lawn, pet’s park, fragrance garden, tropical garden, viewing deck with trees, seating court, grass pavers and lawns etc.
Fire Hydrant & Fire Sprinkler System in Basements.
Fire Alarms & Public Address System
Entire parking is well designed to suit the number of car parks required. Parking signage and equipment at required places to improve driving comfort.
Dedicated provision for charging 10 electric vehicles (EV) and car washing will be provided.
100% DO Set Backup
Dual source prepaid energy meter for DO power and EB power billing system
Access ramps at all entrance shall be provided for physically challenged.

open amenities

Security Cabin

Entry water feature

Entry feature garden

Entry sculpture / solar pavilion

Visitor parking

Bicycle parking

Waiting pavilion

Bus bay

Bus parking area

Entry Courtyard

Gas bank & Organic waste converter

Car wash area

Electric car / bike charging

Our systematic legal approval process ensures peace of mind for our users. Folium has received almost all statutory compliance approvals and is in the final stages of the last few.

Sanction authority

Approval number

Date of approval

AAI
Airports Authority of India(Hyderabad Airport)

NOC ID:- HIAL/SOUTH/B/102320/507880 &
HIAL/SOUTH/B/102320/5078801

28/10/2020

FIRE/
Govt. of T elangana State Disaster Response & Fire Services Department

Provisional NOC –
Tower – I : ACK. No: 35341 0002021
Tower -2 : ACK. No. 353450002021
Tower – 3 : ACK. No. 353520002021
Tower – 4 : ACK. No. 353550002021
Club house – I : ACK: 353710002021 &
Club House – 2: ACK : 353760002021

25/02/2021








07/02/2021

HMWSSB
Hyderabad Metropolitan Water Supply & Sewerage Board

(a) FC No.CG.M €/ORR Circle/FC/2021-22/531
(b) Certificate Number : 30 / 2021-22

03/09/2021

SEIAA (EC)
State Level Environment Impact Assessment Authority T elangana State (SLEIM)

Proposal Number: SIA/TG/MIS/ 189764/2020
EC Order : SEIAA/TS/OURRD-802/2020-615 Dated: 22-06-2021

16/09/2021

TSPCB (CFE)
T elangana State Pollution Control Board

Application Number: 3186574
Order Number: I 30/TSPCB/CFE/RRD/RO-RR-I-HO/2021
Dated: 09-02-2022

09/02/2022

HMDA
Hyderabad Metropolitan Development Authority

HMDA – Project Approval ( Phase -I for 4 Towers)
(a) File No: HMDA/TEMP/9 I60/21
(b) Application No: 047991 /SMD/R I /U6/HMDA/0508202 I
(c) HMDA File Letter No.04799 I/SMD/RI/U6/HMDA/2021 Dated: I 0-02-2022
(d) Permit No.G I /BP/TPS/570/2022 Dated: 22-02-2022

22/02/2022

RERA
Telangana Real Estate Regulatory Authority

(a)Application Number:……………………………
(b) Registration Number : P024000044 I I

11/04/2022

Our systematic legal approval process ensures peace of mind for our users. Folium has received almost all statutory compliance approvals and is in the final stages of the last few.

Our systematic legal approval process ensures peace of mind for our users. Folium has received almost all statutory compliance approvals and is in the final stages of the last few.

Sanction authority Approval number Date of approval
AAI
Airports Authority of India(Hyderabad Airport)
NOC ID:-
HIAL/SOUTH/B/102320/507880 &
HIAL/SOUTH/B/102320/5078801
28/10/2020
FIRE/
Govt. of T elangana State Disaster Response & Fire Services Department
Provisional NOC –
Tower – 1 : ACK. No: 353410002021
Tower – 2 : ACK. No. 353450002021
Tower – 3 : ACK. No. 353520002021
Tower – 4 : ACK. No. 353550002021
Club house – 1 : ACK: 353710002021 &
Club House – 2: ACK : 353760002021
25/02/2021




07/02/2021
HMWSSB
Hyderabad Metropolitan Water Supply & Sewerage Board
(a) FC No.C.G.M €/ORR Circle/FC/2021-22/531
(b) Certificate Number : 30 / 2021-22
03/09/2021
SEIAA (EC)
State Level Environment Impact Assessment Authority Telangana State (SLEIAA)
Proposal Number :
SIA/TG/MIS/189764/2020
EC Order : SEIAA/TS/OL/RRD-802/2020-615
Dated: 22-06-2021
16/09/2021
TSPCB (CFE)
Telangana State Pollution Control Board
Application Number : 3186574
Order Number: 130/TSPCB/CFE/RRD/RO-RR-1-HO/2021
Dated: 09-02-2022
09/02/2022
HMDA
Hyderabad Metropolitan Development Authority
HMDA – Project Approval ( Phase – 1 for 4 Towers)
(a) File No: HMDA/TEMP/9160/21
(b) Application No: 047991/SMD/R1/U6/HMDA/05082021
(c) HMDA File Letter No.047991/SMD/R1/U6/HMDA/2021
Dated: I 0-02-2022
(d) Permit No.G1/BP/TPS/570/2022
Dated: 22-02-2022
22/02/2022

The Project is funded by & mortgaged with

Enquire Now

Book a visit now

Time to leap out of the screen and experience Folium with all your senses! Please share your details and we will roll out a green carpet for your visit.

Information Form