Home The Details

The Details

Finishes and
specifications

Foundation Substructure

RCC Foundation & RCC Framed Structure

Superstructure

Tower -A , Clubhouse – 1 & 2: Conventional RCC Frame Structure with Block Masonry
Other Tower’s: Aluminium Form Work – Shear Wall Technology

Main Door

Main Door Frame: Best Quality Teak Wood Frame with Polish.
Main Door Shutter: 38 mm to 40 mm both side Teak Veneer Shutter with Polish Finish.

Internal / Bedroom / TOILET Utility DOORS

Engineered hard wood frames with flush shutters of 32mm thickness with enamel paint finished on both sides.

Toilet Doors

Engineered hardwood frame with laminated flush shutters of 38 mm thickness.

Sliding Doors (For Balconies)

UPVC door frames with clear glass shutters, provision for mosquito mesh track.

windows

UPVC window systems with safety grill (MS) and provision for mosquito mesh. Track & Aluminum for toilet ventilators and staircase windows.

external

One coat primer and two coats of external emulsion paint.

internal

Two coats of putty, one coat primer and two coats of emulsion paints of best brands.

Rooms

Living, dining, all bedrooms, kitchen 600×600 mm size nano vitrified tiles.

Corridor

GVT ( Vitrified Tiles).

Common Lobbies

Granite / Vitrified tiles combination flooring as per design

Toilets

Anti-skid ceramic tiles for flooring

All Balconies / Utilities

Mat/ Anti skid ceramic tiles.

Staircase

Up to 3 floors granite and balance anti skid tiles.

Lift Lobby

Granite / Vitrified tiles combination flooring as per design

Kitchen

Dadoing in kitchen: glazed ceramic tiles dado up to 2′ height above kitchen platform

Toilets

Glazed ceramic tile dado up to door/lintel height.

Utility

Tile dado up to 3′ height

balcony

Ms railing as per the elevation

<div class=”faqq”>
<p class=”heading”>Water Connections</p>
Separate municipal tap (manjeera or any other water provided by hmwssb along with bore well water).

</div>
<div class=”faqq”>
<p class=”heading”>Exhausts</p>
Provision for Chimney.

</div>
<div class=”faqq”>
<p class=”heading”>Utility/Wash</p>
Washing machine provision in utility area

</div>
<div class=”faqq”>
Provision for fixing of water RO system

</div>

sanitary

Aquar or Cera or Equivalent

CP fittings

Jaquar or Hindware or Equivalent
Wash basin in all bed room toilets
Wall mounted EWC, with extended tank
Wall mixer with shower.
Provision for geyser and exhaust fans in all bathrooms.

Cables

Concealed copper wiring of Polycab or Anchor or Equivalent.

modular switches

Schneider or Anchor or Equivalent.

power Outlets

For air conditioner’s in all bedrooms, for geysers in all bathrooms, for kitchen hob, chimney, refrigerator, microwave oven, mixer, RO in kitchen & for washing machine in utility area.
Provision For Exhaust Fan in all Toilets

Drainage/ Sewage

PVC pipes & PVC fittings

Water Supply Lines

Internal and external CPVC or UPVC pipes & fittings.

Cable / Internet

Provision for Internet/ DTH

common
amenities and facilities

Sophisticated Round-the-clock security system.
Surveillance cameras at the main security, entrance of each block and club house.
Panic button inside the lifts.
Solar power fencing around the compound.
Passenger lifts & one service lift for each tower with auto rescue device with V3F for energy efficiency.(Schindler/Johnson or Equivalent make)

Softened water

Softened water made available through an exclusive water treatment plant (in case of bore water).

Sewage Treatment

Sewage treatment plant of adequate capacity as per norms will be provided inside the project, treated sewage water will be used for the landscaping /flushing purpose.

RAIN WATER

Rain Water from the terrace will be collected in storage tanks and used for domestic purposes. Excess rain water & Open areas water will be collected through Rain water pipes, which will be discharged in the rain water harvesting pits to recharge the groundwater.

Clubhouse – 1

Reception, lobby, multi-purpose hall, two badminton courts , table tennis, squash court.

Clubhouse – 2

Lobby, yoga / aerobics, kids play area, billiards room, mini theater, gym with equipment, library & guest rooms.

Space for Facilities like

Restaurant/ Multi-Purpose Hall, Creche, Space for Spa & Saloon, Space for Clinic, Pharmacy, Space for Departmental store, Conference Room & Co-Working office Space.
Swimming Pool, half basketball court, tennis court, cricket practice net, kids play areas, senior citizen court, party lawn, central party lawn, open lawn, lawn with seating, amphitheater and promenade, jogging track, outdoor gym and lawn, pet’s park, fragrance garden, tropical garden, viewing deck with trees, seating court, grass pavers and lawns etc.
Fire Hydrant & Fire Sprinkler System in Basements.
Fire Alarms & Public Address System
Entire parking is well designed to suit the number of car parks required. Parking signage and equipment at required places to improve driving comfort.
Dedicated provision for charging 10 electric vehicles (EV) and car washing will be provided.
100% DO Set Backup
Dual source prepaid energy meter for DO power and EB power billing system
Access ramps at all entrance shall be provided for physically challenged.

Our systematic legal approval process ensures peace of mind for our users. Gardens by The Brook has received almost all statutory compliance approvals and is in the final stages of the last few.

Approvals
rECIEVED

APPROVALS
RECIEVED

APPROVAL NUMBER

NOC ID:-
HIAL/SOUTH/B/102320/507880 & HIAL/SOUTH/B/102320/507881

DATE OF APPROVAL

28/10/2020

APPROVAL NUMBER

Provisional NOC –
Tower – 1 : ACK. No: 353410002021
Tower – 2 : ACK. No. 353450002021
Tower – 3 : ACK. No. 353520002021
Tower – 4 : ACK. No. 353550002021
Club house – 1 : ACK: 353710002021 &
Club House – 2: ACK : 353760002021

DATE OF APPROVAL

25/02/2021
07/02/2021

APPROVAL NUMBER

(a) FC No.C.G.M €/ORR Circle/FC/2021-22/531
(b) Certificate Number : 30 / 2021-22

DATE OF APPROVAL

03/09/2021

APPROVAL NUMBER

Proposal Number :
SIA/TG/MIS/189764/2020
EC Order : SEIAA/TS/OL/RRD-802/2020-615

DATE OF APPROVAL

16/09/2021

APPROVAL NUMBER

Application Number : 3186574
Order Number: 130/TSPCB/CFE/RRD/RO-RR-1-HO/2021
Dated: 09-02-2022

DATE OF APPROVAL

09/02/2022

APPROVAL NUMBER

HMDA – Project Approval ( Phase – 1 for 4 Towers)
(a) File No: HMDA/TEMP/9160/21
(b) Application No: 047991/SMD/R1/U6/HMDA/05082021
(c) HMDA File Letter No.047991/SMD/R1/U6/HMDA/2021
Dated: I 0-02-2022
(d) Permit No.G1/BP/TPS/570/2022
Dated: 22-02-2022

DATE OF APPROVAL

22/02/2022

APPROVAL NUMBER

NOC ID:- HIAL/SOUTH/B/102320/507880 & HIAL/SOUTH/B/102320/507881

DATE OF APPROVAL

28/10/2020

APPROVAL NUMBER

Provisional NOC –
Tower – 1 : ACK. No: 353410002021
Tower – 2 : ACK. No. 353450002021
Tower – 3 : ACK. No. 353520002021
Tower – 4 : ACK. No. 353550002021
Club house – 1 : ACK: 353710002021 &
Club House – 2: ACK : 353760002021

DATE OF APPROVAL

25/02/2021
07/02/2021

APPROVAL NUMBER

(a) FC No.C.G.M €/ORR Circle/FC/2021-22/531
(b) Certificate Number : 30 / 2021-22

DATE OF APPROVAL

03/09/2021

APPROVAL NUMBER

Proposal Number :
SIA/TG/MIS/189764/2020
EC Order : SEIAA/TS/OL/RRD-802/2020-615

DATE OF APPROVAL

16/09/2021

APPROVAL NUMBER

Application Number : 3186574
Order Number: 130/TSPCB/CFE/RRD/RO-RR-1-HO/2021
Dated: 09-02-2022

DATE OF APPROVAL

09/02/2022

APPROVAL NUMBER

HMDA – Project Approval ( Phase – 1 for 4 Towers)
(a) File No: HMDA/TEMP/9160/21
(b) Application No: 047991/SMD/R1/U6/HMDA/05082021
(c) HMDA File Letter No.047991/SMD/R1/U6/HMDA/2021
Dated: I 0-02-2022
(d) Permit No.G1/BP/TPS/570/2022 Dated: 22-02-2022

DATE OF APPROVAL

22/02/2022

open amenities

Security Cabin

Entry water feature

Entry feature garden

Entry sculpture / solar pavilion

Visitor parking

Bicycle parking

Waiting pavilion

Bus bay

Bus parking area

Entry Courtyard

Gas bank & Organic waste converter

Car wash area

Electric car / bike charging

Enquire Now

Book a visit now

Time to leap out of the screen and experience Gardens by the Brook  with all your senses! Please share your details and we will roll out a green carpet for your visit.

Information Form